2 項進行中

115-1 選課時程

進行中

  • 初選第一階段 6/15 – 6/18
  • 初選第二階段 6/22 – 6/25
  • 校際選修 進行中 8/24 – 9/18
  • 初選第三階段 8/31 – 9/3
  • 開學後加退選 進行中 9/7 – 9/21
  • 逾期加退選 9/21 – 9/24
選課資源

加入行事曆

選擇訂閱 Google Calendar,或下載通用的 ICS 檔案。

使用 Google Calendar 時,Google 會收到這份課表的公開連結。

物流作業規劃模式

Planning Models for Logistics Operations

學期
111-2
學分
0 學分
當期課號
537301
永久課號
MGTM30024
開課單位
運輸與物流管理學系物流管理碩博士班
授課教師
姚銘忠
校區
光復
類別
選修
上課時間表
週二
2
09:00–09:50
物流作業規劃模式
A905(光復)
3 節連堂
3
10:10–11:00
4
11:10–12:00

* 根據陽明交大上課時間表所列

概述

Based on mathematical models, the objective of this course is to analyze the problems and present the solution algorithms for the planning and resource scheduling problems in a logistics system. The main issues covered in the course include forecasting analysis, inventory management, production/operations planning, operations scheduling and project planning and scheduling. In particular, the decisions problems for both planning (long-term) and operational (short-term) levels are discussed. In addition, this course not only addresses the problems from the methodology point of view, but also put considerable emphasis on the practical sides of logistics management. Finally, the course incorporates the software package application (e.g., EXCEL) and the programming skill training so as build up students' experience and capability to solve the practical problems that might be encountered in the field.

先修科目

None.

備註

無備註

教學方式

Lecture

評分方式

1. Evaluation and Grading Policy: (1) Homework: 20%; (2) Class Participation: 5%; (3) Exam I: 25%; (4) Exam II: 25%; (5) Exam III:25%; The instructor will give in-class lectures unless the University mandates all the courses must be given on-line. All the examinations will be in-class. 2. Pedagogy and other supplementary information (websites, TAs, handouts and/or databases): http://e3.nctu.edu.tw/

課程大綱
  • Demand Forecasting

    1. Times Series Model 2. Causal Model

    講授:
    6
  • Inventory Control Problems

    1. The aggregate planning problem 2. EOQ Model and its variants 3. Stochastic Inventory Models

    講授:
    12
  • Push and Pull Production Control Systems

    1. Push vs Pull 2. MRP basics/Optimal lot sizing 3. JIT basics 4. Comparison of JIT and MRP

    講授:
    18
  • Operations Scheduling

    1. The job shop scheduling problem. 2. Sequencing rules and results. 3. Line balancing.

    講授:
    12
  • Project Scheduling

    1. Critical path/ Time costing methods. (Online learning) 2. Project scheduling with uncertain activity times. (Online learning)

    講授:
    6
週次計畫
週次主題
第 1 週

Course Introduction Demand Forecasting Models

2023-02-14(二)
第 2 週

Demand Forecasting Models

2023-02-21(二)
第 3 週

The aggregate planning problem Solving the aggregate planning problem by linear programming

2023-02-28(二)
第 4 週

Basic EOQ Models and Other deterministic inventory models

2023-03-07(二)
第 5 週

News vendor problem Lot size – reorder point systems

2023-03-14(二)
第 6 週

The periodic review model Examination I (Chapters 2, 3 and 4)

2023-03-21(二)
第 7 週

Push vs Pull MRP basics

2023-03-28(二)
第 8 週

Spring break

2023-04-04(二)
第 9 週

Dynamic lot sizing models

2023-04-11(二)
第 10 週

Optimal lot sizing for time-varying demand

2023-04-18(二)
第 11 週

Incorporate lot sizing into explosion calculus

2023-04-25(二)
第 12 週

Lot sizing with capacity constraints Examination II (Chapters 5 and 6/Optimal lot sizing )

2023-05-02(二)
第 13 週

JIT fundamentals (Parts lectured by online learning)

2023-05-09(二)
第 14 週

The job shop scheduling problem

2023-05-16(二)
第 15 週

Sequencing rules and results

2023-05-23(二)
第 16 週

Line balancing

2023-05-30(二)
第 17 週

Examination III

2023-06-06(二)
第 18 週

Critical path/ Time costing methods (Online learning)

2023-06-13(二)
教科書

Steven Nahmias, Production and Operations Analysis (6/e), McGraw Hill/Irwin, 2009.

Office Hours
地點
Assembly Building One A809: Prof. Ming-Jong Yao
時間
2 EFG
聯絡方式
Prof. Ming-Jong Yao ext: 57215; myao@nycu.edu.tw