工程經濟
Engineering Economy
| 節 | 週四 |
|---|---|
5 13:20–14:10 | 工程經濟 MB506(光復) 3 節連堂 |
6 14:20–15:10 | |
7 15:30–16:20 |
* 根據陽明交大上課時間表所列
The course provides the principles and methods needed for systematically assessing the economic value of proposed solutions to engineering challenges.
無 (None)
無備註
教師未提供此項資料
Homework (3) 5% each, Quiz (2) 15% each, Midterm 30%, Term Project 25%, Participation additional +5%
Basic Concept and Time Value of Money
• Cost concepts • Cost estimation techniques • Time value of money
- 講授:
- 40%
Project Economic Analysis and Decision
• Project evaluation • Projects comparison • Depreciation, taxes, and prices changes
- 講授:
- 30%
Advanced Economic Analysis
• Replacement Analysis • Cost Ratio Method • Analysis with Uncertainty
- 講授:
- 30%
| 週次 | 主題 |
|---|---|
| 第 1 週 | Introduction to Engineering Economy 2025-09-04(四) |
| 第 2 週 | Cost Concepts and Design Economics 2025-09-11(四) |
| 第 3 週 | Cost-Estimation Techniques 2025-09-18(四) |
| 第 4 週 | Time Value of Money I 2025-09-25(四) |
| 第 5 週 | Time Value of Moneys II 2025-10-02(四) |
| 第 6 週 | Evaluating Single Project, Quiz I 2025-10-09(四) |
| 第 7 週 | Comparison and Selection among Alternatives 2025-10-16(四) |
| 第 8 週 | Depreciation and Income Taxes 2025-10-23(四) |
| 第 9 週 | Midterm Exam 2025-10-30(四) |
| 第 10 週 | Price Changes and Exchange Rates 2025-11-06(四) |
| 第 11 週 | Replacement Analysis I 2025-11-13(四) |
| 第 12 週 | Replacement Analysis II 2025-11-20(四) |
| 第 13 週 | Cost Ratio Method 2025-11-27(四) |
| 第 14 週 | Break Even and Sensitivity Analysis, Quiz II 2025-12-04(四) |
| 第 15 週 | Probabilistic Risk Analysis 2025-12-11(四) |
| 第 16 週 | Term Project Presentation 2025-12-18(四) |
Sullivan, William G., Elin M. Wicks, and C. Patrick Koelling. Engineering economy. Pearson, 2019, 17th edition.
- 地點
- MB512
- 時間
- Wednesday 13:30 – 14:30 or by appointment
- 聯絡方式
- kaiwen.tien@nycu.edu.tw
